| Project Name | Industrial and Commercial Bank of China Guizhou New Sub branch Hall | Project Introduction | 1. Two U-shaped strip screens on the front 2. One interactive ground screen. |
|---|---|---|---|
| Project Date | 2022.07 | Equipment used | KS9000、KS928*2、S4*12、G612F*238 |
| Project Location | Ninghe District, Tianjin | Project Requirements | 1. Centralized control of one server. 2. Smooth playback without jamming, clear and smooth picture quality. 3.8k resolution point to point playback. |
View all cases
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Name:Zhejiang Shengqi technology exhibition hall Co., Ltd
Project Date:2021.08
Project Location:Hangzhou City, Zhejiang Province
Project Introduction:Four displays of different sizes
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Shenzhen Futian Financial Innovation Center
Project Name:Shenzhen Futian Financial Innovation Center
Project Date:2021.06
Project Location:Futian District, Shenzhen
Project Introduction:An approximate 8K screen
-
Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Name:Auspicious Hyatt Regency Daqing, Heilongjiang Province
Project Date:2020.07
Project Location:DaQing
Project Introduction:P4, 12320*1520, 13 screens open at the same time, and switch and play
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.