| Project Name | Shandong Jinan Shangang Party Construction Exhibition Hall | Project Introduction | 1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points. |
|---|---|---|---|
| Project Date | 2021.05 | Equipment used | LS16,KLS24,G612C*150 |
| Project Location | Jinan City, Shandong Province | Project Requirements | 1. All screens are point-to-point. 2. Play smoothly without jamming, and the picture quality is clear and smooth. |
View all cases
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
Exhibition hall of bonded port area
Project Name:Exhibition hall of bonded port area
Project Date:2020.12
Project Location:Ningbo City, Zhejiang Province
Project Introduction:1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display.
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Jiaoling longevity of the township some exhibition hall
Project Name:Jiaoling longevity of the township some exhibition hall
Project Date:2020.07
Project Location:MeiZhou
Project Introduction:One round awning 2496*2496, seven modeling screens 1760*270/1760*270/2112*330/2112*330/2640*420/2640*420/2640*420 *420
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Autumn harvest uprising immersive experience center
Project Name:Autumn harvest uprising immersive experience center
Project Date:2020.01
Project Location:Tonggu
Project Introduction:P2.5
-
Jiangsu century edge wedding Art Center
Project Name:Jiangsu century edge wedding Art Center
Project Date:2020.03
Project Location:Jiangsu
Project Introduction:P2. 5 ordinary brush, 35 long, 43 high, screen resolution 4480 * 2240, semicircular