| Project Name | Jiahong revitalization Center | Project Introduction | 1. The three screens display different images respectively 2 p1. 58 small spacing screen |
|---|---|---|---|
| Project Date | 2021.08 | Equipment used | SV16、G616*55、MF630 |
| Project Location | Dongguan City, Guangdong Province | Project Requirements | 1. 1 computer for centralized control; 2. Smooth playback without jamming, clear and smooth picture quality; 3. Automatic control screen opening and closing time. |
View all cases
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
Anhui Lu'an iron and Steel Co., Ltd
Project Name:Anhui Lu'an iron and Steel Co., Ltd
Project Date:2020.11
Project Location:Anhui
Project Introduction:The wall screen can be divided or combined, and the picture quality is clear and smooth.
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
The western gold
Project Name:The western gold
Project Date:2020.01
Project Location:Urumqi, xinjiang
Project Introduction:2688x1152,P2.5
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
Shangyu HP Plaza exhibition hall
Project Name:Shangyu HP Plaza exhibition hall
Project Date:2021.01
Project Location:Shangyu City, Zhejiang Province
Project Introduction:Immersive display with four screens
-
Autumn harvest uprising immersive experience center
Project Name:Autumn harvest uprising immersive experience center
Project Date:2020.01
Project Location:Tonggu
Project Introduction:P2.5