| Project Name | Hangzhou a unit exhibition hall | Project Introduction | Skyscreen strip screen, display custom material, set off the environment display |
|---|---|---|---|
| Project Date | 2020.01 | Equipment used | KS920P、S2、G612 |
| Project Location | Hangzhou | Project Requirements | 1. 29 bar screen connection display 2. Multiple strip screen awning effect |
View all cases
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200
-
Anhui Lu'an iron and Steel Co., Ltd
Project Name:Anhui Lu'an iron and Steel Co., Ltd
Project Date:2020.11
Project Location:Anhui
Project Introduction:The wall screen can be divided or combined, and the picture quality is clear and smooth.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name:Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
China military museum
Project Name:China military museum
Project Date:2020.01
Project Location:Beijing
Project Introduction:Four cylinder screens, divided into two large cylinders and two small cylinders
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
An exhibition hall in dongguan
Project Name:An exhibition hall in dongguan
Project Date:2020.01
Project Location:Dongguan
Project Introduction:Indoor P2.5 project, trapezoidal screen
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000