| Project Name | Tangshan Kailuan tourist area service desk | Project Introduction | 1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4 |
|---|---|---|---|
| Project Date | 2021.04 | Equipment used | LS16*2,LS4,P1c,G616*60,G612*116 |
| Project Location | Tangshan City, Hebei Province | Project Requirements | 1. Four screens with different specifications can be controlled independently; 2. Multiple videos or pictures can be played circularly; 3. The display needs to be clear to ensure the effect; 4. The power supply needs automatic control. |
View all cases
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
Jiangxi Fuzhou Wanxiang Xinyuan science and technology wisdom exhibition hall
Project Name:Jiangxi Fuzhou Wanxiang Xinyuan science and technology wisdom exhibition hall
Project Date:2022.04
Project Location:Fuzhou, Jiangxi
Project Introduction:1. Exhibition hall 8 P1 86 screen
-
Hangzhou a unit exhibition hall
Project Name:Hangzhou a unit exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Skyscreen strip screen, display custom material, set off the environment display
-
Tangshan Kailuan tourist area service desk
Project Name:Tangshan Kailuan tourist area service desk
Project Date:2021.04
Project Location:Tangshan City, Hebei Province
Project Introduction:1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Jiangsu Greenland ideal city exhibition hall
Project Name:Jiangsu Greenland ideal city exhibition hall
Project Date:2020.09
Project Location:Jiangsu
Project Introduction:P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four
-
Shenzhen Futian Financial Innovation Center
Project Name:Shenzhen Futian Financial Innovation Center
Project Date:2021.06
Project Location:Futian District, Shenzhen
Project Introduction:An approximate 8K screen
-
Yunxi Chaohui, Changsha City, Hunan Province
Project Name:Yunxi Chaohui, Changsha City, Hunan Province
Project Date:2022.10
Project Location:Changsha City, Hunan Province
Project Introduction:A total of 3 large outdoor advertising screens, with an overall resolution of over 8K.
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.