| Project Name | Tangshan Kailuan tourist area service desk | Project Introduction | 1. A large screen at the front door with a resolution of 3840 * 2176 2 There are five square column screens in the inner hall, and the resolution of each column is 1536 * 832 3 There is a background screen behind the bar with a resolution of 2816 * 576 4 |
|---|---|---|---|
| Project Date | 2021.04 | Equipment used | LS16*2,LS4,P1c,G616*60,G612*116 |
| Project Location | Tangshan City, Hebei Province | Project Requirements | 1. Four screens with different specifications can be controlled independently; 2. Multiple videos or pictures can be played circularly; 3. The display needs to be clear to ensure the effect; 4. The power supply needs automatic control. |
View all cases
-
Hebei Gaobeidian Shanhe formation mould center
Project Name:Hebei Gaobeidian Shanhe formation mould center
Project Date:2020.09
Project Location:Hebei
Project Introduction:Full screen 3200 ✖ 3968, high tech P2 5。 One sv16 + T1 to realize complete point-to-point display.
-
Exhibition hall of bonded port area
Project Name:Exhibition hall of bonded port area
Project Date:2020.12
Project Location:Ningbo City, Zhejiang Province
Project Introduction:1. Ultra long screen approximate point-to-point display; 2. One slide control screen; 3.. Unified broadcast control of multi screen display.
-
Immersive exhibition hall of Jiangxi Guangfeng Convention and Exhibition Center
Project Name:Immersive exhibition hall of Jiangxi Guangfeng Convention and Exhibition Center
Project Date:2022.06
Project Location:Shangrao City, Jiangxi Province
Project Introduction:1. Five screen immersive point-to-point display2
-
Shangyu HP Plaza exhibition hall
Project Name:Shangyu HP Plaza exhibition hall
Project Date:2021.01
Project Location:Shangyu City, Zhejiang Province
Project Introduction:Immersive display with four screens
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Yunxi Chaohui, Changsha City, Hunan Province
Project Name:Yunxi Chaohui, Changsha City, Hunan Province
Project Date:2022.10
Project Location:Changsha City, Hunan Province
Project Introduction:A total of 3 large outdoor advertising screens, with an overall resolution of over 8K.
-
China military museum
Project Name:China military museum
Project Date:2020.01
Project Location:Beijing
Project Introduction:Four cylinder screens, divided into two large cylinders and two small cylinders