| Project Name | Hebei Tangshan Qian'an Tangshan special steel | Project Introduction | The large 4K curved screen in the exhibition hall of Qian'an Tangshan special steel enterprise uses ks9800 video processor. Ks9800 video processor supports kystar frame synchronization (KFS) technology, which can ensure the complete frame synchronization |
|---|---|---|---|
| Project Date | 2021.08 | Equipment used | KS9800、S2*16、G628*128 |
| Project Location | Tangshan City, Hebei Province | Project Requirements | 1. Clear picture quality 2. Convenient operation 3. Perfect effect |
View all cases
-
Henan Luoyang science and Technology Museum
Project Name:Henan Luoyang science and Technology Museum
Project Date:2021.04
Project Location:Luoyang, Henan
Project Introduction:Science and technology exhibition hall in the museum, P2 5-icnd2038s-5958, special-shaped plate and conventional version
-
Southeast smart city, Shijiazhuang City, Hebei Province
Project Name:Southeast smart city, Shijiazhuang City, Hebei Province
Project Date:2021.07
Project Location:Shijiazhuang City, Hebei Province
Project Introduction:Three outdoor screens, a transparent screen, two grille screens and a super large sky screen.
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
The fourth people's hospital of guizhou
Project Name:The fourth people's hospital of guizhou
Project Date:2020.01
Project Location:Guizhou
Project Introduction:P2.5,3200x1152
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Guizhou Geological Museum
Project Name:Guizhou Geological Museum
Project Date:2022.06
Project Location:Guiyang City, Guizhou Province
Project Introduction:There are three screens, a tunnel screen, a three fold screen on the wall and a conventional screen, all of which are P2 modules.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Heilongjiang Heihe huma TV studio
Project Name:Heilongjiang Heihe huma TV studio
Project Date:2021.03
Project Location:Heilongjiang
Project Introduction:One main screen on the front and one ear screen on both sides.
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front