| Project Name | Sichuan Yuechi Bar | Project Introduction | 1. Two secondary screens on the side, with a DJ table. 2. Circular distribution on the top |
|---|---|---|---|
| Project Date | 2022.07 | Equipment used | KLS12*2、LS8、G612*148 |
| Project Location | Yuechi County, Sichuan Province | Project Requirements | 1. One computer for centralized control. 2. Smooth playback without jamming, clear and smooth picture quality. |
View all cases
-
Beijing banana ring KTV
Project Name:Beijing banana ring KTV
Project Date:2021.02
Project Location:Beijing
Project Introduction:This project includes transparent screen module, soft module, outdoor P3 module, 1.86 module, 2.5 module and other multi specification modules. Each compartment adopts the combination of main screen 1.86 module and auxiliary screen 2.5 module. Each compar
-
Luohu Huarun Mixc City
Project Name:Luohu Huarun Mixc City
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:Indoor P2 project, ring screen
-
Guangdong Yangjiang bar
Project Name:Guangdong Yangjiang bar
Project Date:2021.05
Project Location:Yangjiang City, Guangdong Province
Project Introduction:1. There is a main screen on the front and a DJ Table 2 Two ring screen 3 Long screen around.
-
KTV, Tiantian No.1, Nanchang City, Jiangxi Province
Project Name:KTV, Tiantian No.1, Nanchang City, Jiangxi Province
Project Date:2021.05
Project Location:Nanchang City, Jiangxi Province
Project Introduction:1. Four walls plus ceiling special-shaped screen 2 Two special-shaped auxiliary screens are added in the front circle, and the other three trapezoidal screens are 3 The sky curtain has a diamond shaped screen made of small triangles.
-
Spherical screen of a screen factory in Shenzhen
Project Name:Spherical screen of a screen factory in Shenzhen
Project Date:2020.09
Project Location:Shenzhen
Project Introduction:The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules.
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Yan'an Wuqi science and Technology Museum
Project Name:Yan'an Wuqi science and Technology Museum
Project Date:2020.09
Project Location:Yan'an
Project Introduction:1. An arched screen on the front with a resolution of 2688 * 3008 2 Surrounded by an ultra long strip screen, surrounded by three sides, with a resolution of 45952 * 896 3 An arc screen, resolution: 3840 * 1024 4 The two circles are called
-
Nanshan museum
Project Name:Nanshan museum
Project Date:2018.06
Project Location:Shenzhen
Project Introduction:P3 project, tree project, whole screen number 1216*1728
-
Beijing banana ring KTV phase II
Project Name:Beijing banana ring KTV phase II
Project Date:2021.06
Project Location:Beijing
Project Introduction:1. Each room has a ceiling screen, round or rectangular 2 There will be irregular shaped screens on some walls of the room.