| Project Name | Hubei Kongjing KTV Party Room | Project Introduction | Multiple screens realize scene linkage. |
|---|---|---|---|
| Project Date | 2022.05 | Equipment used | LS4*3、LS2*18 |
| Project Location | Wuhan, Hubei Province | Project Requirements | 1. The screen of each room is displayed independently. 2. The screens in each room need to be linked together. 3. There are many heterogeneous screens on site, and some modules need to be offset. |
View all cases
-
Stair screen of a square in Shanghai
Project Name:Stair screen of a square in Shanghai
Project Date:2021.01
Project Location:Shanghai
Project Introduction:Stair screen displays the whole picture
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.11
Project Location:Tibet
Project Introduction:Front main screen top ring screen four perimeter strip screen spherical screen in the sky screen.
-
Ordos Kangbashi sweat factory bar
Project Name:Ordos Kangbashi sweat factory bar
Project Date:2020.11
Project Location:erdos
Project Introduction:Point to point display and unified broadcast control
-
Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Name:Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Date:2021.05
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Ten Rubik's cube screens are displayed on three sides at the bottom of the front and back, with a total of 26 sides.
-
V + CLUB bar in DeZhou
Project Name:V + CLUB bar in DeZhou
Project Date:2020.07
Project Location:DeZhou
Project Introduction:There are multiple screens in the bar, indoor P4 module, home screen pixel point 3328*2048, side screen pixel point 512*1920, DJ table pixel point 2240*256, ceiling screen 33 groups of 200*240 boxes and six groups of ring screen.
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
Zhuhai sanxi kechuang town
Project Name:Zhuhai sanxi kechuang town
Project Date:2018.03
Project Location:Guangdong zhuhai
Project Introduction:This project is composed of P3 conventional screen and P4 floor tile screen, two pieces are spliced together to form an l-shaped screen
-
Hebei Cangzhou Nanpi radio and television station
Project Name:Hebei Cangzhou Nanpi radio and television station
Project Date:2021.12
Project Location:Cangzhou City, Hebei Province
Project Introduction:A total of 22 screens to achieve full point-to-point display