| Project Name | A bar in Chengdu, Sichuan | Project Introduction | 1 x screen, 3 column screens, 4 ceiling screens and 4 perimeter strip screens |
|---|---|---|---|
| Project Date | 2020.11 | Equipment used | ES4×12 KS8000 |
| Project Location | Chengdu | Project Requirements | Safe and stable |
View all cases
-
A bar in Chengdu, Sichuan
Project Name:A bar in Chengdu, Sichuan
Project Date:2020.11
Project Location:Chengdu
Project Introduction:1 x screen, 3 column screens, 4 ceiling screens and 4 perimeter strip screens
-
Yan'an Wuqi science and Technology Museum
Project Name:Yan'an Wuqi science and Technology Museum
Project Date:2020.09
Project Location:Yan'an
Project Introduction:1. An arched screen on the front with a resolution of 2688 * 3008 2 Surrounded by an ultra long strip screen, surrounded by three sides, with a resolution of 45952 * 896 3 An arc screen, resolution: 3840 * 1024 4 The two circles are called
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Liaoning Anshan Tavern
Project Name:Liaoning Anshan Tavern
Project Date:2021.07
Project Location:Anshan, Liaoning
Project Introduction:Anshan tavern is equipped with several special-shaped screens with different shapes.
-
Stair screen of a square in Shanghai
Project Name:Stair screen of a square in Shanghai
Project Date:2021.01
Project Location:Shanghai
Project Introduction:Stair screen displays the whole picture
-
Guangdong Yangjiang bar
Project Name:Guangdong Yangjiang bar
Project Date:2021.05
Project Location:Yangjiang City, Guangdong Province
Project Introduction:1. There is a main screen on the front and a DJ Table 2 Two ring screen 3 Long screen around.
-
Guizhou Yinjiang Mushang KTV
Project Name:Guizhou Yinjiang Mushang KTV
Project Date:2022.03
Project Location:Tongren City, Guizhou Province
Project Introduction:1. P4 door head M-screen, P4 screen in large compartment
-
Nanshan museum
Project Name:Nanshan museum
Project Date:2018.06
Project Location:Shenzhen
Project Introduction:P3 project, tree project, whole screen number 1216*1728