| Project Name | Chongqing West Railway Station - Chongqing eye City Exhibition Hall | Project Introduction | 1.4 projectors 2 A curved front uses two projectors 3 Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection |
|---|---|---|---|
| Project Date | 2022.01 | Equipment used | F2 |
| Project Location | Chongqing | Project Requirements | 1. Centralized computer control; 2. Play smoothly without jamming, and the picture quality is clear and smooth; 3. Central control. |
View all cases
-
Inner Mongolia Baotou Jiuqu Hotel
Project Name:Inner Mongolia Baotou Jiuqu Hotel
Project Date:2021.05
Project Location:Baotou, Inner Mongolia
Project Introduction:Indoor P4 main screen 2304 × 1024, auxiliary screen 640 × one thousand and twenty-four × 2 wave screen 13248 × six hundred and forty.
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.09
Project Location:Xigaze, Tibet
Project Introduction:1. There is a main screen on the front and a DJ console on both sides of the main screen The top surface is an annular screen composed of 8 arcs, and both the inner and outer arcs have screens; There is also a spherical screen in the middle of the sky cur
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
V + CLUB bar in DeZhou
Project Name:V + CLUB bar in DeZhou
Project Date:2020.07
Project Location:DeZhou
Project Introduction:There are multiple screens in the bar, indoor P4 module, home screen pixel point 3328*2048, side screen pixel point 512*1920, DJ table pixel point 2240*256, ceiling screen 33 groups of 200*240 boxes and six groups of ring screen.
-
Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Name:Magic cube screen, Vientiane City, Shantou City, Guangdong Province
Project Date:2021.09
Project Location:Shantou City, Guangdong Province
Project Introduction:The project site uses 85 sets of 5 large magic cube screens + 55 sets of 5 small magic cube screens, with a total of 140 ceiling magic cube screens.
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Stair screen of Pingdu Zhongjie square overpass
Project Name:Stair screen of Pingdu Zhongjie square overpass
Project Date:2021.06
Project Location:Pingdu City, Shandong Province
Project Introduction:Whole stair screen
-
Guizhou Qingzhen lesen bar
Project Name:Guizhou Qingzhen lesen bar
Project Date:2020.09
Project Location:Qingzhen Town, Guiyang City
Project Introduction:Indoor P4 module, 64x64 and 64x32 There is a circular main screen, a DJ platform and two four pillars on the front. The walls on both sides are long and the sky curtain is irregular.
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.