| Project Name | Riverside Hotel | Project Introduction | 1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816. |
|---|---|---|---|
| Project Date | 2020.12 | Equipment used | KS9000, Kommander F2,ES4×15, G612C×326 |
| Project Location | Ji'an City, Jiangxi Province | Project Requirements | 1. One computer for centralized control and easy to use; 2. The playing picture is not stretched, the playing video is not stuck, and the picture quality is clear and smooth; 3. The transmitting equipment can realize automatic brightness adjustment. |
View all cases
-
Datang network exhibition hall
Project Name:Datang network exhibition hall
Project Date:2020.12
Project Location:Jinan City, Shandong Province
Project Introduction:Special shaped triangular module, three sides of the whole screen.
-
Shijiazhuang gymnasium, Hebei Province
Project Name:Shijiazhuang gymnasium, Hebei Province
Project Date:2021.01
Project Location:Shijiazhuang
Project Introduction:1. Main screen 4096 × one thousand one hundred and twenty × 2. Strip screen
-
Inner Mongolia Baotou Jiuqu Hotel
Project Name:Inner Mongolia Baotou Jiuqu Hotel
Project Date:2021.05
Project Location:Baotou, Inner Mongolia
Project Introduction:Indoor P4 main screen 2304 × 1024, auxiliary screen 640 × one thousand and twenty-four × 2 wave screen 13248 × six hundred and forty.
-
Nanchang County Cultural Center Grand Theater
Project Name:Nanchang County Cultural Center Grand Theater
Project Date:2022.01
Project Location:Nanchang City, Jiangxi Province
Project Introduction:One main and six auxiliary opening and closing, lifting screen
-
Hefei Miko KTV
Project Name:Hefei Miko KTV
Project Date:2022.04
Project Location:Hefei City, Anhui Province
Project Introduction:Corridor screen, private room ceiling, wall modeling screen, strip screen and vertical strip screen
-
Shenyang wedding hotel
Project Name:Shenyang wedding hotel
Project Date:2020.01
Project Location:Shenyang
Project Introduction:Four pillar screens, four side screens, one awning
-
Guizhou Daozhen bar
Project Name:Guizhou Daozhen bar
Project Date:2021.01
Project Location:Daozhen County, Guizhou
Project Introduction:1. One main screen on the front, vertical bar screen on the side, and multiple triangular screens on the ceiling.
-
Luohu Huarun Mixc City
Project Name:Luohu Huarun Mixc City
Project Date:2020.07
Project Location:ShenZhen
Project Introduction:Indoor P2 project, ring screen
-
Science and Technology Museum of Jiangxi Ruijin culture and Art Center
Project Name:Science and Technology Museum of Jiangxi Ruijin culture and Art Center
Project Date:2021.02
Project Location:Jiangxi
Project Introduction:Horn column screen of science and Technology Museum