Project Name | Nanchang County Cultural Center Grand Theater | Project Introduction | One main and six auxiliary opening and closing, lifting screen |
---|---|---|---|
Project Date | 2022.01 | Equipment used | Kommander F2、KS9800、G612c*448 |
Project Location | Nanchang City, Jiangxi Province | Project Requirements | 1. Use one computer and broadcast control software for centralized control; 2.48 network cables, large screen, loaded with one ks9800 equipment, saving cost and reducing cabinet space. |
View all cases
-
Urumqi shenma bar
Project Name:Urumqi shenma bar
Project Date:2020.01
Project Location:Urumqi
Project Introduction:The large screen has a resolution of 1280x1280, which is a special-shaped screen of peach heart and rotated by 45
-
Sichuan Yanting Live House
Project Name:Sichuan Yanting Live House
Project Date:2022.05
Project Location:Yanting City, Sichuan Province
Project Introduction:1. One main screen on the front, 1DJ platform 2. Skyscreen square layout 3. Square screen around.
-
Hubei enshi Athena bar
Project Name:Hubei enshi Athena bar
Project Date:2020.01
Project Location:Enshi
Project Introduction:
-
Shenzhen baoan creative museum
Project Name:Shenzhen baoan creative museum
Project Date:2020.01
Project Location:
Project Introduction:2304×1536,P4
-
Penglai Space bar
Project Name:Penglai Space bar
Project Date:2020.01
Project Location:Penglai
Project Introduction:Various different screens display 2, P4 modules independently, high refresh, do rotation, with HUB port offset.
-
Nanjing garden city happy blue sea cinema
Project Name:Nanjing garden city happy blue sea cinema
Project Date:2019.12
Project Location:Nanjing
Project Introduction:KS9000、S2、G612、F2
-
Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Name:Advertising display screen of wanxianghui shopping mall in Nanchang City, Jiangxi Province
Project Date:2021.05
Project Location:Nanchang City, Jiangxi Province
Project Introduction:Ten Rubik's cube screens are displayed on three sides at the bottom of the front and back, with a total of 26 sides.
-
Sichuan Yuechi Bar
Project Name:Sichuan Yuechi Bar
Project Date:2022.07
Project Location:Yuechi County, Sichuan Province
Project Introduction:1. Two secondary screens on the side, with a DJ table. 2. Circular distribution on the top
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2 A curved front uses two projectors 3 Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection