Project Name | Shijiazhuang gymnasium, Hebei Province | Project Introduction | 1. Main screen 4096 × one thousand one hundred and twenty × 2. Strip screen |
---|---|---|---|
Project Date | 2021.01 | Equipment used | KS9000,Kommander F2 |
Project Location | Shijiazhuang | Project Requirements | 1. Point to point display 2. Convenient operation 3. Perfect effect |
View all cases
-
Guizhou Daozhen bar
Project Name:Guizhou Daozhen bar
Project Date:2021.01
Project Location:Daozhen County, Guizhou
Project Introduction:1. One main screen on the front, vertical bar screen on the side, and multiple triangular screens on the ceiling.
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Guangxi Baise Garden Expo
Project Name:Guangxi Baise Garden Expo
Project Date:2020.11
Project Location:Guangxi
Project Introduction:Three screens on the left, middle and right + floor tile screen, showing a complete picture on four sides
-
Inner Mongolia Baotou Jiuqu Hotel
Project Name:Inner Mongolia Baotou Jiuqu Hotel
Project Date:2021.05
Project Location:Baotou, Inner Mongolia
Project Introduction:Indoor P4 main screen 2304 × 1024, auxiliary screen 640 × one thousand and twenty-four × 2 wave screen 13248 × six hundred and forty.
-
Changshu Zeus bar
Project Name:Changshu Zeus bar
Project Date:2021.04
Project Location:Changshu City, Jiangsu Province
Project Introduction:There are four sky curtains and two long screens on the left and right sides.
-
Guizhou Xingyihua Music Bar
Project Name:Guizhou Xingyihua Music Bar
Project Date:2022.07
Project Location:Xingyi City, Guizhou Province
Project Introduction:Bar screen is divided into main screen, sky screen, side screen, strip screen and outdoor strip screen.
-
Riverside Hotel
Project Name:Riverside Hotel
Project Date:2020.12
Project Location:Ji'an City, Jiangxi Province
Project Introduction:1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.
-
Zhuhai sanxi kechuang town
Project Name:Zhuhai sanxi kechuang town
Project Date:2018.03
Project Location:Guangdong zhuhai
Project Introduction:This project is composed of P3 conventional screen and P4 floor tile screen, two pieces are spliced together to form an l-shaped screen
-
Beijing banana ring KTV
Project Name:Beijing banana ring KTV
Project Date:2021.02
Project Location:Beijing
Project Introduction:This project includes transparent screen module, soft module, outdoor P3 module, 1.86 module, 2.5 module and other multi specification modules. Each compartment adopts the combination of main screen 1.86 module and auxiliary screen 2.5 module. Each compar