Project Name | Shenyang wedding hotel | Project Introduction | Nine door screens and one canopy |
---|---|---|---|
Project Date | 2020.01 | Equipment used | kommander F2,S8,KS8000,G616 |
Project Location | Shenyang | Project Requirements | Good. There's a linkage between the screens |
View all cases
-
Shijiazhuang gymnasium, Hebei Province
Project Name:Shijiazhuang gymnasium, Hebei Province
Project Date:2021.01
Project Location:Shijiazhuang
Project Introduction:1. Main screen 4096 × one thousand one hundred and twenty × 2. Strip screen
-
Guizhou Daozhen bar
Project Name:Guizhou Daozhen bar
Project Date:2021.01
Project Location:Daozhen County, Guizhou
Project Introduction:1. One main screen on the front, vertical bar screen on the side, and multiple triangular screens on the ceiling.
-
Guizhou Xishui Junpin international KTV tree screen
Project Name:Guizhou Xishui Junpin international KTV tree screen
Project Date:2021.06
Project Location:Zunyi City, Guizhou Province
Project Introduction:Indoor P4 soft module to assemble a tree screen
-
Shanghai mall Exhibition Center
Project Name:Shanghai mall Exhibition Center
Project Date:2021.10
Project Location:Shanghai
Project Introduction:The project is a special-shaped ball screen with a diameter of 3M and spliced by nine special-shaped modules.
-
Changshu Zeus bar
Project Name:Changshu Zeus bar
Project Date:2021.04
Project Location:Changshu City, Jiangsu Province
Project Introduction:There are four sky curtains and two long screens on the left and right sides.
-
Datang network exhibition hall
Project Name:Datang network exhibition hall
Project Date:2020.12
Project Location:Jinan City, Shandong Province
Project Introduction:Special shaped triangular module, three sides of the whole screen.
-
Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Name:Hebei Shijiazhuang lerentang Pharmaceutical Co., Ltd
Project Date:2021.01
Project Location:Shijiazhuang, Hebei
Project Introduction:1.G612C × 40 2. Full screen 14080 × 256 3. T1 discount point-to-point loaded P4 module
-
Xigaze tide card plus
Project Name:Xigaze tide card plus
Project Date:2020.09
Project Location:Xigaze, Tibet
Project Introduction:1. There is a main screen on the front and a DJ console on both sides of the main screen The top surface is an annular screen composed of 8 arcs, and both the inner and outer arcs have screens; There is also a spherical screen in the middle of the sky cur
-
Shenzhen baoan creative museum
Project Name:Shenzhen baoan creative museum
Project Date:2020.01
Project Location:
Project Introduction:2304×1536,P4