| Project Name | Riverside Hotel | Project Introduction | 1. One main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. Indoor P3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816. |
|---|---|---|---|
| Project Date | 2020.12 | Equipment used | KS9000, Kommander F2,ES4×15, G612C×326 |
| Project Location | Ji'an City, Jiangxi Province | Project Requirements | 1. One computer for centralized control and easy to use; 2. The playing picture is not stretched, the playing video is not stuck, and the picture quality is clear and smooth; 3. The transmitting equipment can realize automatic brightness adjustment. |
View all cases
-
Shougang international qinhuangdao logistics base
Project Name:Shougang international qinhuangdao logistics base
Project Date:1970.01
Project Location:Qinhuangdao
Project Introduction:Full screen 22 transparent screen, need full screen display screen, shooting effect is good.
-
A bar in Zunyi
Project Name:A bar in Zunyi
Project Date:2020.07
Project Location:Zunyi
Project Introduction:Control all LED screens with effects on the Resolume software
-
Zhuhai sanxi kechuang town
Project Name:Zhuhai sanxi kechuang town
Project Date:2018.03
Project Location:Guangdong zhuhai
Project Introduction:This project is composed of P3 conventional screen and P4 floor tile screen, two pieces are spliced together to form an l-shaped screen
-
Stair screen of a square in Shanghai
Project Name:Stair screen of a square in Shanghai
Project Date:2021.01
Project Location:Shanghai
Project Introduction:Stair screen displays the whole picture
-
Changshu Zeus bar
Project Name:Changshu Zeus bar
Project Date:2021.04
Project Location:Changshu City, Jiangsu Province
Project Introduction:There are four sky curtains and two long screens on the left and right sides.
-
Spherical screen of a screen factory in Shenzhen
Project Name:Spherical screen of a screen factory in Shenzhen
Project Date:2020.09
Project Location:Shenzhen
Project Introduction:The hemispherical screen is composed of three modules. There are two trapezoidal modules below, one circular module above, and one circular module is composed of four sector modules.
-
Sichuan Yuechi Bar
Project Name:Sichuan Yuechi Bar
Project Date:2022.07
Project Location:Yuechi County, Sichuan Province
Project Introduction:1. Two secondary screens on the side, with a DJ table. 2. Circular distribution on the top
-
Science and Technology Museum of Jiangxi Ruijin culture and Art Center
Project Name:Science and Technology Museum of Jiangxi Ruijin culture and Art Center
Project Date:2021.02
Project Location:Jiangxi
Project Introduction:Horn column screen of science and Technology Museum
-
Nanjing garden city happy blue sea cinema
Project Name:Nanjing garden city happy blue sea cinema
Project Date:2019.12
Project Location:Nanjing
Project Introduction:KS9000、S2、G612、F2