| Project Name | Hebei publishing media group | Project Introduction | 1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens. |
|---|---|---|---|
| Project Date | 2022.04 | Equipment used | KS9800,F2*2 |
| Project Location | Shijiazhuang, Hebei | Project Requirements | 1. Clear picture quality 2. Convenient operation 3. Perfect effect |
View all cases
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Shenzhen yishijie factory
Project Name:Shenzhen yishijie factory
Project Date:2021.04
Project Location:Shenzhen
Project Introduction:P3-mbi5124-138-32s-2.5m diameter horn screen, special-shaped plate
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Tianjin Ninghe Citizen Square Exhibition Hall
Project Name:Tianjin Ninghe Citizen Square Exhibition Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen
-
Hangzhou China mobile exhibition hall
Project Name:Hangzhou China mobile exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Curved screen display