| Project Name | Ziyang Yagu science and Innovation Park | Project Introduction | The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point. |
|---|---|---|---|
| Project Date | 2021.03 | Equipment used | KS9800,G612C,Kommander F2 |
| Project Location | Sichuan | Project Requirements | 1. Use one Kommander F2 control, point-to-point display, and play customized 8K materials smoothly without jamming. 2. Play customized 8K materials smoothly without compression, restore the picture color and retain the image details, and the playing pict |
View all cases
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name:Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Ziyang Yagu science and Innovation Park
Project Name:Ziyang Yagu science and Innovation Park
Project Date:2021.03
Project Location:Sichuan
Project Introduction:The project is an L-shaped immersion LED screen, which is centrally controlled by one Kommander F2 server and displayed point-to-point.
-
Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Name:Chongqing West Railway Station - Chongqing eye City Exhibition Hall
Project Date:2022.01
Project Location:Chongqing
Project Introduction:1.4 projectors 2. A curved front uses two projectors 3 .Two projectors for one ground 4 Projection fusion display complete picture 5 Central control light, LCD screen, projection
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Jilin University Town studio
Project Name:Jilin University Town studio
Project Date:2021.12
Project Location:Jilin City, Jilin Province
Project Introduction:Side screen 1280 × 2048 two, main screen 5440 × 2048, total resolution 8000 × 2048.
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Qingyuan court of Qingyuan County, Zhejiang Province
Project Name:Qingyuan court of Qingyuan County, Zhejiang Province
Project Date:2021.11
Project Location:Qingyuan County, Lishui City, Zhejiang Province
Project Introduction:1. A stage P1 83 large screen 2 One p1 on the wall 53led screen 3 Five vertical LCD.