| Project Name | Autumn harvest uprising immersive experience center | Project Introduction | P2.5 |
|---|---|---|---|
| Project Date | 2020.01 | Equipment used | F2 |
| Project Location | Tonggu | Project Requirements | 1. The super-large screen USES two servers cascaded together, one main and one pair, the wall screen 10240*1984 main end, the ground screen 6656*3968 secondary end, excellent immersive effect. 2. The playing effect is perfect and the customer is satisfie |
View all cases
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Sand table of Xiangxi high tech Zone
Project Name:Sand table of Xiangxi high tech Zone
Project Date:2021.04
Project Location:Xiangxi City, Hunan Province
Project Introduction:1. The whole screen is 8320 * 1024, and one sv16 is loaded
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Guizhou Geological Museum
Project Name:Guizhou Geological Museum
Project Date:2022.06
Project Location:Guiyang City, Guizhou Province
Project Introduction:There are three screens, a tunnel screen, a three fold screen on the wall and a conventional screen, all of which are P2 modules.
-
Zhejiang Taizhou Laoshui plant
Project Name:Zhejiang Taizhou Laoshui plant
Project Date:2021.07
Project Location:Taizhou City, Zhejiang Province
Project Introduction:The space-time corridor, wall surface, top surface and column form a whole
-
Sichuan Yibin international bamboo products trading center
Project Name:Sichuan Yibin international bamboo products trading center
Project Date:2021.04
Project Location:Yibin City, Sichuan Province
Project Introduction:One computer controls three screens
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Electric Power Research Division of Hebei electric power company
Project Name:Electric Power Research Division of Hebei electric power company
Project Date:2020.09
Project Location:Shijiazhuang City
Project Introduction:Full screen 4800 ✖ 4352,P2. 5。 A ks9800 with 20 outputs and 8 4K inputs realizes complete point-to-point display.
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed