Project Name | Beijing maker town | Project Introduction | 1. A large main screen on the front |
---|---|---|---|
Project Date | 2022.04 | Equipment used | KS9000,ES4 x 6,G612*90 |
Project Location | Beijing | Project Requirements | 1. Centralized computer control 2. One click call of three screens 3. The middle 16:9 picture needs to be clear |
View all cases
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Zhangjiagang Sinosoft group headquarters exhibition hall
Project Name:Zhangjiagang Sinosoft group headquarters exhibition hall
Project Date:2021.05
Project Location:Zhangjiagang City, Jiangsu Province
Project Introduction:1. The resolution of the main screen of the front door is 5760 * 2560, and the resolution of the two column screens are 3840 * 2160 respectively; 2. There are 8 P2 displays in the inner hall, with resolutions of 2 1760 * 1280, 3 2240 * 1280, 2 2400 * 1280
-
Henan 10000 mu Lotus Garden
Project Name:Henan 10000 mu Lotus Garden
Project Date:2021.06
Project Location:Puyang City, Henan Province
Project Introduction:1. Use P2 dual input module to splice into tunnel screen
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
An exhibition hall in mumbai, India
Project Name:An exhibition hall in mumbai, India
Project Date:2020.01
Project Location:Mumbai, India
Project Introduction:11 LCD screens are irregularly spliced
-
Chongqing Wushan Motianling Immersion Project
Project Name:Chongqing Wushan Motianling Immersion Project
Project Date:2022.06
Project Location:Chongqing City
Project Introduction:1.2 Immersive point-to-point display on the panel 2. Tablet cloud control
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed