| Project Name | Jurong Wuyue Plaza KTV | Project Introduction | 1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel. |
|---|---|---|---|
| Project Date | 2020.09 | Equipment used | LS16*1,G616*57 |
| Project Location | Jurong City, Jiangsu Province | Project Requirements | 1. Centralized control by one computer; 2. Play smoothly without jamming, and the picture quality is clear and smooth; 3. With 3D materials, it has the effect of naked eye 3D. |
View all cases
-
Suzhou e-sports hall
Project Name:Suzhou e-sports hall
Project Date:2019.11
Project Location:Suzhou
Project Introduction:a KS8000
-
Shangjin ancient city, Shiyan, Hubei
Project Name:Shangjin ancient city, Shiyan, Hubei
Project Date:2021.07
Project Location:Shiyan City, Hubei Province
Project Introduction:550 ㎡ tunnel screen with a resolution of 20864 * 2944
-
Baotou City Planning Exhibition Hall
Project Name:Baotou City Planning Exhibition Hall
Project Date:2021.12
Project Location:Inner Mongolia
Project Introduction:Separate scene, inner arc projection fusion
-
Henan Luoyang science and Technology Museum
Project Name:Henan Luoyang science and Technology Museum
Project Date:2021.04
Project Location:Luoyang, Henan
Project Introduction:Science and technology exhibition hall in the museum, P2 5-icnd2038s-5958, special-shaped plate and conventional version
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name:Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date:2022.07
Project Location:Jiangxi Province
Project Introduction:1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Haier group international exhibition hall
Project Name:Haier group international exhibition hall
Project Date:2018.09
Project Location:Shandong
Project Introduction:Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Baishi Golden Valley Exhibition Hall naked eye 3D
Project Name:Baishi Golden Valley Exhibition Hall naked eye 3D
Project Date:2021.03
Project Location:Beijing
Project Introduction:1. Through the way of modeling screen (left, middle, right and bottom, four screens), 2 Through the division and reorganization function of F2 server, the video is corresponding to four screens one by one to make 3D effect.
-
Tianjin Ninghe Citizen Square Exhibition Hall
Project Name:Tianjin Ninghe Citizen Square Exhibition Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen
-
Zhejiang Feite Steel Structure Co., Ltd
Project Name:Zhejiang Feite Steel Structure Co., Ltd
Project Date:2022.09
Project Location:Hangzhou, Zhejiang Province
Project Introduction:1. 1 P3 module, screen points 6848 * 2176 2, 1 P2.5 module, screen points 8576 * 3200