| Project Name | Jiaoling longevity of the township some exhibition hall | Project Introduction | One round awning 2496*2496, seven modeling screens 1760*270/1760*270/2112*330/2112*330/2640*420/2640*420/2640*420 *420 |
|---|---|---|---|
| Project Date | 2020.07 | Equipment used | KS9800 |
| Project Location | MeiZhou | Project Requirements | 1. Require point-to-point display of playback video content 2. The splicer interface supports the customization of super wide resolution and grouping screen functions 3. Support online upgrade and modification of input EDID |
View all cases
-
Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Name:Round cake screen of exhibition hall of Kunming Planning Museum, Yunnan
Project Date:2021.03
Project Location:Yunnan
Project Introduction:There is a 3.5m diameter round cake screen and special-shaped plate in the exhibition hall.
-
Jiahong revitalization Center
Project Name:Jiahong revitalization Center
Project Date:2021.08
Project Location:Dongguan City, Guangdong Province
Project Introduction:1. The three screens display different images respectively 2 p1. 58 small spacing screen
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Chutian medicine exhibition hall
Project Name:Chutian medicine exhibition hall
Project Date:2021.11
Project Location:Ningxiang City, Hunan Province
Project Introduction:4K large screen
-
Hebei publishing media group
Project Name:Hebei publishing media group
Project Date:2022.04
Project Location:Shijiazhuang, Hebei
Project Introduction:1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
Hangzhou China mobile exhibition hall
Project Name:Hangzhou China mobile exhibition hall
Project Date:2020.01
Project Location:Hangzhou
Project Introduction:Curved screen display
-
Shenzhen Nanshan site Beiyou Technology Building
Project Name:Shenzhen Nanshan site Beiyou Technology Building
Project Date:2021.08
Project Location:Shenzhen City, Guangdong Province
Project Introduction:P2 - five sided immersion design, five sided tunnel display combined with conventional version and special-shaped plate.
-
Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Name:Memorial Hall of the Fourth National Congress of the Communist Party of China
Project Date:2021.05
Project Location:Shanghai
Project Introduction:1. Two screens are used in the project, and specific materials are played point-to-point, clear and undamaged. The Cassida control system ensures the perfect effect of the exhibition hall.