| Project Name | Auspicious Hyatt Regency Daqing, Heilongjiang Province | Project Introduction | P4, 12320*1520, 13 screens open at the same time, and switch and play |
|---|---|---|---|
| Project Date | 2020.07 | Equipment used | U3Pro×2,G616×163,Kommander F2×1。 |
| Project Location | DaQing | Project Requirements | 1. Use extended mode to play pictures, videos, PPT and so on in a loop on a large screen. To display them synchronously, 13 Windows are needed. 2. The customer requires that all screen videos be on a level surface. 3. More than 13 screens are requir |